Open tender · United Kingdom · Services

NLV Pharos Dry Dock Services 2027

Northern Lighthouse Board

The work

Dry dock facilities for NLV Pharos to carry out 20 year Special survey works including essential works and surveys to meet Classification Society/Flag state requirements

  • Tank/Hull inspection/survey
  • Ship side valves overhaul/survey
  • All safety equipment/systems major overhaul/survey
  • Full Hull painting
  • Thruster overhauls (completed by OEM)
  • Electrical Healthcare
  • Miscellaneous works including ER supply fan overhaul, Helideck equipment maintenance, Mooring equipment maintenance
  • Minimum of 1.5m blocks for ease of access under the vessel

Key facts

Estimated value
£550,000
Contract period
5 November 2026 to 1 March 2027 (possible extension to 31 March 2027)
Evaluation
Quality and cost based (QCBS)
Submission
Online, on the e-procurement portal
Published
08 Sep 2026

What it takes to qualify

Worth a closer look

  • Potential suppliers should provide dates that their drydock is available, noting the approximately 4 week required duration for the works. These are the preferred dates but may be flexible to meet drydock availability.
  • Only required if extra time is required to complete the works

Experience

  • At least 1 similar work — Dry dock facilities for vessel maintenance and surveys

Policy conditions

No reservation, preference or local-content restriction.