Open tender · United Kingdom · Goods
Boiler Plant Replacement & Hybrid Controls Integration at Eckington Active, Gosber Street, Eckington
The work
NEDDC wishes to appoint a contractor for the design, supply, installation, integration, commissioning and handover of replacement gas-fired boiler plant at Eckington Active. The installation is required to provide supplementary, resilience and back-up heating capacity to the existing ASHP-led heating system.
Key facts
- Estimated value
- £62,500
- Published
- 24 Sep 2026