Closed tender · Germany · Contract notice

Deposition Tool 8 Inch

Lehrstuhl für Technische Physik E23, TUM

Lehrstuhl für Technische Physik E23, TUM in Germany invited bids for “Deposition Tool 8 Inch”. Bids closed on 5 October 2026.

The work

UHV cluster System for the fabrication of superconducting circuits on 8 inch wafers

  • UHV conditions
  • HV load-lock chamber
  • central handling chamber
  • UHV chamber for evaporation of Al thin films
  • UHV chamber for sputtering of superconductors
  • UHV chamber for oxidation
  • UHV chamber for Ar ion milling
  • flipping station

What it takes to qualify

Worth a closer look

  • Siehe Leistungsbeschreibung
  • Siehe Vergabeunterlagen