Supplier · public contract awards
Groupement Agence Philippe Tardits, Architecte Mandataire/BET Fluides Project Ingenierie co-traitant/ Architecture intérieure ARCHI-TECH co-traitant public contracts.
Groupement Agence Philippe Tardits, Architecte Mandataire/BET Fluides Project Ingenierie co-traitant/ Architecture intérieure ARCHI-TECH co-traitant has won 2 public contracts in 2009 from 1 public buyer in France. Its most frequent buyer is La SEM Maryse Bastie représentée par la SCET, mandataire (2 awards). Outside TED, published values total €185,972 across 1 award. 1 award was published on TED; the median contract size is about €190,000 (1 contract with a value).
Latest contracts won
Contracts won by year
Published value, by currency (feeds other than TED)
Typical contract size on TED
From published award records. Suppliers are matched by legal name; a company with a different legal name in another country (a national subsidiary, for example) has its own page. Each currency is shown on its own and never converted. TED values are often framework ceilings, so TED awards show a median contract size, never a total.
Bid with askTender
Bidding against Groupement Agence Philippe Tardits, Architecte Man?
askTender reads any open tender against your company profile — eligibility, the gaps, and the documents you need — and can prepare the entire bid.
askTender See open tenders