Closed tender · India · Dial Type Indicating Pressure Gauges

Dial type indicating Pressure Gauges

Ministry of Railways

Ministry of Railways in India invited bids for “Dial type indicating Pressure Gauges”. Bids closed on 8 October 2026, 09:00 IST. To qualify, bidders need at least one similar completed work, OEM Authorization Certificate and GST registration. Reference: GEM/2026/B/8090946.

The work

Supply of 10 Dial type indicating Pressure Gauges

  • Type: Pressure Gauge
  • Gauge Service Classification: Industrial Gauge
  • Type of Pressure Element: Bourdon Tube
  • Shape of Pressure Element: C-Type
  • Method of Mounting: Direct Mounting
  • Mounting Support: Flange
  • Process connection: Back
  • End Connection Type: Male

Key facts

Bid validity
120 days
Contract period
90
Evaluation
Total value wise evaluation
Submission
Online, on the e-procurement portal
Published
28 Sep 2026
Reference
GEM/2026/B/8090946

What it takes to qualify

Worth a closer look

  • Supplier should mandatorily upload an e invoice declaration (Format attached in ATC document) and last 3 years Turnover details along with bill at the time of supply of material and consignee should ensure to upload the same on IPAS before processing of bills.
  • All GeM Sellers/Service Providers shall ensure full compliance with all applicable labour laws, including the provisions, rules, schemes and guidelines under the four Labour Codes i.e. the Code on Wages, 2019; the Industrial Relations Code, 2020; the Occupational Safety, Health and Working Conditions Code, 2020; and the Code on Social Security, 2020 as and when notified and brought into force by the Government of India.

Experience

  • At least 1 similar work — No specific experience criteria mentioned

Certifications and registrations

OEM Authorization CertificateRequired for authorization
GST registrationCertificate (Requested in ATC)

Policy conditions

  • Purchase preference for micro and small enterprises
  • Bidders from certain countries are restricted

Documents to submit

  1. Certificate (Requested in ATC)Required for authorization
  2. OEM Authorization CertificateRequired for authorization
  3. e-invoice declarationFormat attached in ATC document
  4. Last 3 years Turnover detailsRequired along with bill at time of supply