Supplier · public contract awards
Burhani Engineers Limited public contracts.
Burhani Engineers Limited has won 9 public contracts between 2018 and 2026 from 3 public buyers in 3 countries. Its most frequent buyer is Kenya Electricity Generating Company (4 awards). Besides Kenya, it has won contracts in Uganda and Rwanda. Published values total KES 142 million across 6 awards and $14.59 million across 3 awards.
9Contracts won
3Public buyers
3Countries
May 2026Latest award
Latest contracts won
Tender for Supply of Multifunction Instrument Documenting CalibratorAwarded by Kenya Electricity Generating Company · Kenya · KES 10.7 million
29 May 2026Awarded
Tender for Purchase of 5NO. Micro Motion 4700 Field-Mount Flow TransmittersAwarded by Kenya Petroleum Refineries Limited · Kenya · KES 10.57 million
16 Jun 2025Awarded
Direct Procurement for Repair and Reinstatement of Power at Substation B (SSB) at Moi International Airport (MIA)Awarded by Kenya Airport Authority · Kenya · KES 879,744
31 Jan 2024Awarded
Plant Design, Supply, and Installation Procurement of the Construction and Rehabilitation of MV Lines for Distribution Network in Kigali$6.91 million
8 Apr 2020Awarded
Procurement of Design, Supply and Installation of 33kV and 11kV Lines and Associated Low Voltage Networks for Grid Intensification Under ERT III (29 S$3.52 million
30 May 2019Awarded
Procurement of Plant, Design, Supply and Installation of the Works for the Construction of 33kV Medium Voltage Power lines and associated Low Voltage $4.16 million
3 Dec 2018Awarded
Tender for Supply, Installation & Commissioning of Kengen Detergent Manufacturing PlantAwarded by Kenya Electricity Generating Company · Kenya · KES 42.45 million
19 Oct 2018Awarded
KGN-SBP-14-2017 Tender for Design, Manufacture, Supply, Installation, Training and Commissioning of Calibration Centre EquipmentAwarded by Kenya Electricity Generating Company · Kenya · KES 74.59 million
1 Oct 2018Awarded
Tender for Design,supply,installation and Commissioning of Temperature Control System for Gogo Power StationAwarded by Kenya Electricity Generating Company · Kenya · KES 2.91 million
20 Aug 2018Awarded
Contracts won by year
Contracts won by year
from the published records20184
20191
20201
20241
20251
20261
Published value, by currency
KES · 6 valued
KES 142 million
USD · 3 valued
$14.59 million
From published award records. Suppliers are matched by legal name; a company with a different legal name in another country (a national subsidiary, for example) has its own page. Each currency is shown on its own and never converted.
Bid with askTender
Bidding against Burhani Engineers Limited?
askTender reads every open tender against your company profile — eligibility, the gaps, and the documents you need — and can prepare the entire bid.
Start bidding ↗ See open tenders