Open tender · Switzerland · Contract notice

Pumpspeicherwerk Grimsel 4 - Bauhauptlos

Kraftwerke Oberhasli AG

Kraftwerke Oberhasli AG in Switzerland is inviting bids for “Pumpspeicherwerk Grimsel 4 - Bauhauptlos”. Bids close on 9 October 2026.

The work

Construction of a 150 MW pumped-storage hydroelectric power plant (PSW Grimsel 4) in Switzerland, including civil works like pressure tunnels, caverns, and intake/outlet structures.

What it takes to qualify

Worth a closer look

  • Award criteria (detail)

Policy conditions

No reservation, preference or local-content restriction.