Open tender · United States · Special Notice

INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)

W072 Endist Louisville · CO 80913

W072 Endist Louisville in the United States is inviting bids for “INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)”. Bids close on 6 October 2026. To qualify, bidders need at least 3 similar completed works.

The work

Construction of Equipment Concentration Site (ECS) Complex including warehouses, maintenance facilities, storage buildings, and specialized infrastructure at Fort Carson, Colorado

  • UFC Compliance (Unified Facilities Criteria)
  • AT/FP (Antiterrorism/Force Protection) standards
  • Sustainable design principles per Army Sustainable Design and Development Policy
  • Cybersecurity compliance per UFC 4-010-06
  • Fire protection compliance with UFC and NFPA standards

Key facts

Evaluation
Two-step Qualifications-Based Selection (QBS) process
Published
21 Sep 2026
Reference
W912QR-IndustryDay-FortCarsonECS-CMARwithOTA

What it takes to qualify

Worth a closer look

  • The Government will utilize a two-step, Qualifications-Based Selection (QBS) process under the authority of 10 U.S.C. § 2808a
  • Price is not evaluated during the initial selection steps
  • Submissions are limited to a format of 10 pages or less
  • Each pitch presentation is expected to last a maximum of three and a half (3.5) hours
  • Firms will have 60 minutes to deliver an oral presentation
  • The Government will select one firm to enter negotiations with for the Articles and Agreement Phase 1 pricing

Experience

  • At least 3 similar works — complex heavy-industrial, vehicle maintenance, or logistics/warehousing facilities utilizing collaborative delivery methods (CM@Risk, Progressive Design-Build, etc.)
  • Target Value Design (TVD) integration and open-book cost reconciliation
  • Lean Construction and scheduling to prevent trade stacking on-site
  • Off-site industrial prefabrication and modularization strategies
  • Civil site logistics, mass grading, utility tie-ins, soil stabilization
  • Weather-risk management for heavy high-shear concrete paving
  • Executing seamless coordination within a secure, active installation
  • Anti-Terrorism/Force Protection (AT/FP) posture compliance
  • Proof needed: client references

Policy conditions

No reservation, preference or local-content restriction.

Documents to submit

  1. Corporate Experience & RelevanceMaximum of three projects as Prime Contractor completed within last 10 years
  2. Recent Performance EvaluationsCPARS evaluations, Past Performance Questionnaires [PPQs], Letters of Recommendation
  3. Technical Merit NarrativeWritten approach demonstrating execution of specialized requirements
  4. Bonding and Financial CapacityVerifiable evidence of financial stability and required bonding capacity