Closed tender · Liberia · Consulting
Feasibility Studies, Economic and Financial Analysis, and Conceptual Engineering Design for the Buchanan to Nimba (Legacy) Corridor.
Infrastructure Implementation Unit
Infrastructure Implementation Unit in Liberia invited bids for “Feasibility Studies, Economic and Financial Analysis, and Conceptual Engineering Design for the Buchanan to Nimba (Legacy) Corridor”. Bids closed on 9 October 2026, 14:00 UTC. Reference: LR-IIU-569555-CS-QCBS.
Key facts
- Published
- 25 Sep 2026
- Reference
- LR-IIU-569555-CS-QCBS
