Open tender · United States · Solicitation
Snow Removal Services, Westville Lake, Southbridge, MA
W2SD Endist New England in the United States is inviting bids for “Snow Removal Services, Westville Lake, Southbridge, MA”. Bids close on 6 October 2026. To qualify, bidders need at least one similar completed work, First Aid and CPR Certification and Activity Hazard Analysis (AHA). Reference: W912WJ26QA172.
The work
Provide all equipment, materials, labor, and transportation necessary to perform snow removal and salting services at the Westville Lake project areas
- Snow removal limited to on-site pushing or lifting beyond guardrails
- Salt is required (no sand)
- Daily measurements based on East Brimfield Lake project office
- Compensation based on final cumulative snowfall total
- Pre-work conference required with Project Manager and Quality Control Personnel present
Key facts
- Contract period
- From contract award to April 30
- Evaluation
- Reference section M of the solicitation for evaluation criteria
- Price basis
- Unit pricing based on snowfall accumulation tiers
- Published
- 22 Sep 2026
- Reference
- W912WJ26QA172
What it takes to qualify
Worth a closer look
- The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor
- A subcontractor would need to meet the requirements of these positions and accept the designation. The subcontractor would also have to have the authority to act on behalf of the prime Contractor
- The prime Contractor is responsible for overseeing all work and coordination with the Government
Experience
- At least 1 similar work — Snow removal and salting services
Certifications and registrations
Level 3 Site Safety and Health Officer (SSHO)Designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health responsibility
First Aid and CPR CertificationFor shifts with multiple employees, provide at least two employees certified in First Aid and CPR
Activity Hazard Analysis (AHA)Submitted and accepted for each definable feature of work
Policy conditions
No reservation, preference or local-content restriction.
Documents to submit
- ENG Form 6293 (Accident Prevention Plan Worksheet)Required prior to commencement of work
- ENG Form 6206 (Activity Hazard Analysis)Required for each definable feature of work
- ENG Form 6282 (Site Safety and Health Officer Designation Letter)Designates SSHO personnel
- First Aid and CPR CertificatesRequired for safety personnel
- Solicitation SurveyMust be completed in entirety with quote submission