Closed tender · United States · Public tender

CGC Hollyhock Drydock

SFLC Procurement Branch 2 (00085)

SFLC Procurement Branch 2 (00085) in the United States invited bids for “CGC Hollyhock Drydock”. Bids closed on 7 October 2026, 10:00 EDT. To qualify, bidders need at least 3 similar completed works, Drydock Certification and Dry-Dock Calculations. Reference: 70Z08526QIBCT0036.

The work

Drydock repairs to the U.S. Coast Guard Cutter USCGC HOLLYHOCK FY27

  • All work must be performed in exact accordance with this solicitation and attached specifications
  • Must provide all necessary materials, equipment, and personnel
  • Must comply with SFLC Standard Specifications

Key facts

Bid validity
120 days
Contract period
Award by October 30, 2026; performance November 3, 2026 to February 1, 2027
Evaluation
Quality and cost based (QCBS)
Price basis
Firm fixed price basis for task orders
Procedure
Combined Synopsis/Solicitation
Published
24 Sep 2026
Reference
70Z08526QIBCT0036

What it takes to qualify

Worth a closer look

  • The solicitation mentions 'Geographical Restricted' (See Attachment 1, Milcon J & A) but doesn't specify the restrictions
  • The document mentions 'SFLC Standard Specification 6310, 0000, 0740, 8634' but doesn't provide details
  • The document mentions 'DFAS.mil; Pay & Allowance; Family Separation Allowance' but doesn't provide specific details

Experience

  • At least 3 similar works — Dry Dock ship repair services of similar size, scope, and complexity within the last 5 years

Certifications and registrations

Drydock CertificationCurrent certification for the facility to be used
Dry-Dock CalculationsPre-award calculations as per SFLC Standard Specification 8634
Welding CertificationsRequired for applicable work items per SFLC Standard Specification 0740
Personnel QualificationsCertified Technical Representatives, Qualified Technical Representatives, Certified Coating Inspectors, etc.

Policy conditions

No reservation, preference or local-content restriction.

Documents to submit

  1. Planning DocumentGantt chart showing period of performance, critical path, float, etc.
  2. Past Performance InformationUsing Attachment 3 form for 3 previous contracts
  3. Proof of InsuranceStatement of coverage from current insurance carrier
  4. Subcontractor ListList of all anticipated subcontractors with details
  5. Location of FacilityExact location of the facility to be used