Open tender · Poland · Construction work

Budowa układu drogowego łączącego ul. Antoniego Tabaki z ul. Tysiąclecia w Swarzędzu wraz z budową bezkolizyjnego przejazdu pod torami (wiaduktu kolejowego) na wysokości ul. Tabaki w Swarzędzu w km 292,400 linii kolejowej nr 3 Warszawa Zachodnia-Kunowice

In EnglishConstruction of a road system connecting Antoniego Tabaki Street with Tysiąclecia Street in Swarzędz along with the construction of a grade-separated crossing under the tracks (railway viaduct) at Tabaki Street in Swarzędz at km 292,400 of railway line no. 3 Warsaw Zachodnia-Kunowice

Gmina Swarzędz

Gmina Swarzędz in Poland is inviting bids for “Construction of a road system connecting Antoniego Tabaki Street with Tysiąclecia Street in Swarzędz along with the construction of a grade-separated…”. Bids close on 14 October 2026, 10:00 CEST. Who can bid: At least two completed engineering structures built under an active railway without track closures, each worth at least 10 000 000,00 PLN gross, one using the push or another trenchless method; At least two bituminous pavement projects of at least 7000 m2 each, completed in the last 5 years. askTender lists every requirement to qualify and checks whether your company meets them.

The tender in brief

Road link and railway underpass in Swarzędz, for contractors with major bridge and rail experience

Construction of a road system connecting Antoniego Tabaki and Tysiąclecia streets in Swarzędz, including a collision-free crossing under the railway line at km 292.400 of line no. 3 Warszawa Zachodnia–Kunowice. The works cover road, railway, bridge, utility and green infrastructure. The contract may be extended with similar works up to 25 000 000,00 PLN.

Who can win it

  • At least two completed engineering structures built under an active railway without track closures, each worth at least 10 000 000,00 PLN gross, one using the push or another trenchless method
  • At least two bituminous pavement projects of at least 7000 m2 each, completed in the last 5 years
  • Key personnel including a bridge works manager with 10 years' experience and a project worth at least 5 000 000 PLN gross under continuous rail traffic

Key facts

Procedure
Contract notice
How bids are judged
Price 60%, warranty period for bridge structure 20%, warranty period for other scope 10%, bridge works manager experience 10%

Before you bid, askTender

Everything else is in your askTender account

The requirements to qualify, the eligibility check and the bid documents for this tender are in your askTender account.

  • What it takes to qualify: every requirement, in the tender’s own words
  • Whether your company qualifies: your profile checked against each requirement, showing what you have, what’s missing and how to close the gap
  • The documents to file: a checklist, with draft declarations ready to sign
  • A bid partner for any requirement you can’t meet alone
  • The tender documents, ready to open
  • Alerts for new tenders like this one

Public data: TED – Tenders Electronic Daily. © European Union, 1998–2026. Notices reused under Commission Decision 2011/833/EU. · Sources & licences