Open tender · Brazil · Public tender
[Portal de Compras Públicas] - Aquisição de 01 (um) caminhão usado, configuração 8x2, com 04 (quatro) eixos, sendo 02 (dois) eixos direcionais, equipado com prancha (ano mínimo de fabricação 2024), destinado ao transporte de máquinas, equipamentos e cargas pesadas, para atendimento das necessidades do Município de Cacique Doble/RS
In EnglishPublic Procurement Portal - Acquisition of 01 (one) used truck, 8x2 configuration, with 04 (four) axles, being 02 (two) steering axles, equipped with a loading bed (minimum manufacturing year 2024), for the transport of machines, equipment and heavy loads, to meet the needs of the Municipality of Cacique Doble/RS
Municipio de Cacique Doble in Brazil is inviting bids for “Public Procurement Portal - Acquisition of 01 (one) used truck, 8x2 configuration, with 04 (four) axles, being 02 (two) steering axles, equipped with…”. Bids close on 13 October 2026, 07:59 GMT−3; the estimated value is R$378,333. askTender lists every requirement to qualify and checks whether your company meets them.
The tender in brief
Purchase of one used 8x2 truck with four axles and a flatbed, for suppliers of heavy vehicles
The Municipality of Cacique Doble, in Rio Grande do Sul, Brazil, is buying one used truck, 8x2 configuration, with four axles, two of them steering, equipped with a flatbed manufactured in 2024 or later. It is meant to carry machines, equipment and heavy loads. The contract is awarded by lowest price in an electronic reverse auction.
Key facts
- Estimated value
- R$378,333
- Procedure
- Pregão Eletrônico
- How bids are judged
- Lowest price in an electronic reverse auction
- Published
- 30 Sep 2026
Before you bid, askTender
Everything else is in your askTender account
The requirements to qualify, the eligibility check and the bid documents for this tender are in your askTender account.
- What it takes to qualify: every requirement, in the tender’s own words
- Whether your company qualifies: your profile checked against each requirement, showing what you have, what’s missing and how to close the gap
- The documents to file: a checklist, with draft declarations ready to sign
- A bid partner for any requirement you can’t meet alone
- The tender documents, ready to open
- Alerts for new tenders like this one
Public data: Portal Nacional de Contratações Públicas. · Sources & licences
