Open tender · United States · Public tender
Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 3-2025. Specification No. OM25137
W07V Endist New Orleans in the United States is inviting bids for “Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 3-2025. Specification No. OM25137”. Bids close on 21 July 2027, 11:30 EDT. Reference: W912P825BA008. Who can bid: The proposed dredge must have achieved the required production rate for at least 30 days on a single contract within three years before bid opening; Bidders must be registered in the System for Award Management (SAM). askTender lists every requirement to qualify and checks whether your company meets them.
The tender in brief
Hydraulic cutterhead dredging of a saltwater barrier sill in the Mississippi River, for dredging firms with a proven dredge.
The US Army Corps of Engineers, New Orleans District, seeks a contractor to hydraulically dredge and place material to build and maintain a saltwater barrier sill between Mile 63.0 and Mile 64.0 Above Head of Passes on the Mississippi River. The work is a firm fixed-price contract with estimated quantities for dredging, mobilization, and option items. The construction magnitude is between $10,000,000.00 and $25,000,000.00.
Who can win it
- The proposed dredge must have achieved the required production rate for at least 30 days on a single contract within three years before bid opening
- Bidders must be registered in the System for Award Management (SAM)
- The contractor must certify that dredging will commence within 120 hours after Notice to Proceed and meet the minimum production rate
Key facts
- Procedure
- Solicitation
- How bids are judged
- Award to the responsible bidder with the lowest priced responsive bid.
- Published
- 22 Jul 2025
- Reference
- W912P825BA008
Before you bid, askTender
Everything else is in your askTender account
The requirements to qualify, the eligibility check and the bid documents for this tender are in your askTender account.
- What it takes to qualify: every requirement, in the tender’s own words
- Whether your company qualifies: your profile checked against each requirement, showing what you have, what’s missing and how to close the gap
- The documents to file: a checklist, with draft declarations ready to sign
- A bid partner for any requirement you can’t meet alone
- The tender documents, ready to open
- Alerts for new tenders like this one
Public data: SAM.gov Contract Opportunities (U.S. General Services Administration). · Sources & licences
